In this section: |
After you have designed, tuned, and saved your measure load, you can load the data by clicking the Load button in the Measure Loader. A message appears, informing you that the measure you loaded is completed (for example, "Measure load is completed for Measure Series: Sales").
How to: |
You can automatically run a saved measure load during specified time intervals using ReportCaster.
The Measure Load Schedule form opens.
Note: The Measure Load Schedule form generates Interval, Start Date, and Start Time values based on the values you specified for the load. You can edit these values as needed.
For information on editing a saved schedule, see Manage Tab - Schedules.
WebFOCUS |