Determining the Status of an Event-Based Flow

When you schedule an event-based execution, the flow is scheduled for immediate execution. If resources are available, the flow will receive its run-time parameters from the DataMigrator internal data store and begin its extraction and load as designed.

Submit the request with CMRUN. It sets a return code to the calling environment indicating if the request was submitted or completed successfully, depending on the setting for the Wait parameter.

You can also determine the status of a flow after it has been submitted. This can be done in the following ways.


iWay Software