Transformations show a list of an auto-generated plan
files that are derived from the Logical Model per each entity defined.
Each plan has pre-generated input and output interfaces. The logic
has to be completed manually.
In the MDM hub context, a plan is used for transition between
two neighboring logical layers.
-
Cleanse plan. Defines the cleansing, standardization,
and validation logic. It serves as a transition between L1 and L2.
-
Match plan. Defines the match (or de-duplication) logic
and allows you to perform aggregate calculations. It serves as a
transition between L2 and L3.
-
Merge plan. Defines the logic for creating a golden (master)
record from a group of instance records. It also allows you to perform
aggregate calculations. All values from previous steps are available
here. It serves as a transition between L3 and L4 and also between
the Instance and Master Layer.